Terry Johnson's Combination Layout

This layout will be on a tour featured for the TCA National 2007 Convention

Return to RMDTCA Layout Page

Terry has four world class layouts/collections. You can visit the others here.
View Terry's - Standard Gauge Layout
View Terry's - Standard Gauge Wall Displays
View Terry's - O Scale Layout
View Terry's - 3 Rail Layout

Background: - This layout, owned and operated by Terry Johnson of Denver Colorado is one of four that Terry has created. It is is a combination of a two-rail O scale run on the bottom level, a three-rail O scale in the middle level and the top level is American Flyer. All track and turnouts are Atlas. Construction was started in October of 2002 and finished in the fall of 2005.


Layout Diagram
Total layout size is 27' wide by 34-6" deep. The black lines represent the O Scale 2 rail layout that runs on the bottom layer. The pink lines represent the 3-rail that runs on the middle level. The turquoise lines represent the American Flyer layout which runs on the top back level. The shaded box on the bottom is for a lift-bridge to allow access.
 


Over All Views
Looking South

Looking Southwest

Looking Southeast


The American Flyer Section
Top Level

Custom Bridge
Second level

Bridge - Over and Under

The Roundhouse
Bottom Level

Coming Out of a Tunnel

One view of the Town Setting

Control Panel



Construction Photos Below

End View
Looking South


Starting Mountain Construction
A View Southwest


Closer Up View Southwest


The Bridge is Installed


And it is Magnificent!



Scenery is coming along - Aug 04


The American Flyer Layout has been installed



Return to RMDTCA Layout Page